← Back to job listings
AC
Head - Mechanical (BOP)
Adani Career Site · West Bengal, India
About The Role
1. Mechanical BOP Leadership
- Take end-to-end ownership of assigned Mechanical BOP packages.
- Define package-wise execution, erection and commissioning strategies.
- Integrate BOP construction with BTG, Civil, Electrical and C&I schedules.
2. BOP Package Execution
Lead and coordinate applicable packages including:
- Cooling Water / Circulating Water systems
- Cooling Towers and associated mechanical systems
- Water Treatment / DM Plant
- Raw water and service-water systems
- Compressed air systems
- Fuel oil systems
- Firefighting systems
- HVAC and ventilation
- Pumps, tanks, vessels and utility equipment
- Mechanical piping/utilities
- Associated BOP packages.
3. Engineering Coordination
- Review layouts, P&IDs, piping arrangements, equipment drawings and vendor documents.
- Review construction sequencing and constructability.
- Coordinate technical deviations and site requirements.
4. Procurement & Material Interface
- Work with procurement teams and vendors to track equipment/material readiness.
- Identify delivery risks affecting construction priorities.
- Ensure preservation and storage requirements for critical equipment.
5. Construction & Erection
- Lead erection of equipment, pumps, vessels, piping, ducts and supporting mechanical systems.
- Monitor manpower, fronts, machinery and contractor productivity.
- Resolve package and site-interface constraints.
6. Interfaces
- Manage cross-package interfaces involving BTG, CHP/AHP, Civil, Electrical and C&I.
- Coordinate availability of buildings, foundations, embedded items, power supply and instrumentation interfaces.
- Conduct package-interface reviews until closure.
7. Contractor & Commercial Management
- Monitor EPC/package contractor performance.
- Support bill verification, variation evaluation and contract administration.
- Drive productivity and minimise rework and schedule slippage.
8. Testing & Commissioning
- Drive system completion and commissioning readiness.
- Coordinate flushing, hydrotesting, trial operation and system handover as applicable.
- Ensure prompt closure of punch points.
9. Quality, EHS & Compliance
- Ensure construction compliance with specifications and approved quality plans.
- Drive safe working practices throughout BOP construction.
- Promote zero harm, housekeeping and statutory/EHS compliance.
10. Team Leadership
- Lead BOP package managers, engineers, contractors and field teams.
- Build ownership for package-level cost, quality, schedule and safety.
- B.E./B.Tech. – Mechanical Engineering.
- 20+ years of experience in thermal power/large industrial project construction.
- Strong experience in Mechanical BOP package execution.
- Proven capability to manage multiple vendors, contractors and simultaneous work fronts.
- Experience across engineering, construction and commissioning phases preferred.
Similar roles you might like
See all →FS
Technician- Wastewater/Recycling II IND
First Solar (US)
Salary not disclosedPosted today
AC
Associate General Manager - Mechanical - Projects
Adani Career Site
Salary not disclosedPosted today
SG
Supervisor DGSS Eng
Smiths Group
Salary not disclosedPosted today
SG
Engineering III DGSS
Smiths Group
Salary not disclosedPosted today
BM
Lead Engineer
Blue Machines AI
Salary not disclosedPosted today
N
Technical Specialist
Nokia
Salary not disclosedPosted today
N
Senior Technical Specialist
Nokia
Salary not disclosedPosted today
RE
Engineer – Digitalization
Renesas Electronics
Salary not disclosedPosted today
This is an external listing. JobSpring does not represent or verify the employer. Report this listing