Skip to content
← Back to job listings

Master Thesis Internship - Trustworthiness of CP‑VMI Demand Signals in Semiconductor Boom–Bust Cycles

Nxp · Eindhoven

Entry LevelQuick applyinternshipabout 2 months ago

About The Role

  • Semiconductor supply chains face structural boom--bust cycles driven by long and rigid production lead times, demand volatility, and capacity scarcity. To create
  • planning stability, many manufacturers use Customer Program Vendor-Managed Inventory (CP-VMI) agreements. These contracts specify forecast commitments
  • (e.g., weeks 1--6 fixed), pacing rules (e.g., 95\% pull requirements), upside flexibility caps, and liability clauses for forecast reductions.
  • These mechanisms aim to stabilize near-term demand signals. However, during boom or bust periods, contractual constraints may cause customers to pad forecasts,
  • delay downward revisions, or trigger end-period pull spikes. As a result, the manufacturer’s planning signal may diverge from true consumption—especially at market turning points.

Problem Statement

CP-VMI is designed for environments with stable demand. Semiconductor boom--bust cycles violate this assumption. It is currently unclear:
whether CP-VMI mechanisms dampen or amplify planning signal distortion,
how contract rules interact with cyclical demand regimes,
and which CP-VMI configurations improve robustness to bust-driven demand collapses and boom-driven surges.
More information about NXP in the Netherlands...
#LI-f5d0

This listing was posted by a verified recruiter at Nxp. Report this listing